⚙
Screen Workbench
Sign in to continue
Sign In
First run:
admin
/
admin
— change it after login.
☰
Output ☰
Screen Workbench
AROSS Cable Drive System
⚙
☼
☰
❮
Logout
Export
XLS
CSV
PDF
PLAN
▶
Designs
Save
Save As
New
↻
No saved designs yet.
▶
Greenhouse Sync
SYNCED
Login
Login to sync greenhouse frame
-
Logout
Fetch Greenhouse Frame
Show greenhouse frame in 3D
▶
Structure Dimensions
Structure Type
NVPH
NVPH-GA
NVPH-GA-96
NVPH-TV-NHB
DRSNH
FRSNH
FVPH
Generic / Other
Drive Type
Cable Drive (AROSS)
Cable drive: rolling pipe, ropes, pulleys, winding tightener.
Spans
Span Width (m)
Bays
Bay Length (m)
Custom Shape
Click a cell to take it out of the house · drag to sweep a run · Shift+drag for a block. Zones are drawn in the grid picker, not here.
Fill all
Clear all
Column Height (m)
Column Size
Ø60mm
Ø76mm
Ø90mm
96×48mm (Rect)
90×50mm (Rect)
80×40mm (Rect)
Column Wall (mm)
1.6mm
2.0mm
2.5mm
2.9mm
3.2mm
Screen Drop (m)
Screen sits at (Column Height − Screen Drop)
▶
Screen Options
Installation
Inside
Outside
Middle Column
None
Front + Back
All bays
F/B + Motor position
Middle Column Qty
1 (centre)
2 (span ÷ 3)
Middle Column Size
Ø60mm
Ø76mm
Ø90mm
96×48mm (Rect)
90×50mm (Rect)
80×40mm (Rect)
None · FB (front+back) · All (every bay) · FB+motor (adds motor-row support). Qty = ridge columns per span.
▶
Layers & Zones
1 layer · 1 zone
+ Add Screen Layer
Layer Gap (mm)
▶
Motor & End Hold
No. of Motors
Auto = 1 motor per zone. Add/remove zones above to change this count.
Motor Position
End Hold Pipes
Merge inline square pipes
Shade Net (our supply)
Off by default — the kit is quoted without the cloth. Tick it and the net is priced by area in the bill, the Excel and the PDF.
Steel Pulley → Pulley Distance (m)
Sets how many pulley/cable lines run across the width; auto-updates pulley, saddle & square-clamp counts.
▶
Master Settings
Pipe Selection (per role)
Rolling Pipe
Square Pipe
Guide Rail
Alu Pipe Length (mm)
Alu stick 4050 mm − 50 mm crimp = 4000 mm covered per pipe
Changing pipe OD / material recalculates weights & costs
Pricing (per BoM row)
Reset
Edit any rate to override the default. Changes auto-regenerate.
Generating BOM…
▶
Display
Columns
Gutters
Rolling Pipes
Square Pipes
Alu Pipes
Wire Rope
Polyester Wire
Pulleys
Screen Fabric
Motors
Dimensions
Labels
Zone Boundary
▶
Appearance
Wireframe Mode
Show Axes Helper
Show Grid
Generate
3D
Plan
3D
↺
⛶
◻
W
G
L
☾
👁
Isometric NW
Isometric NE
Isometric SE
Isometric SW
Front
Back
Left
Right
Top
Bottom
+
100%
−
AROSS Screen System
Click Generate
Ready
LMB: Orbit | MMB: Pan | RMB: Zoom | Scroll: Zoom | Dbl-click: Recentre | F: Fit All
N
S
E
W
NORTH
SOUTH
EAST
WEST
Output
BOM · Costing · Summary
❯
▶
Computed Values
Active L:
-
Active W:
-
Bays:
-
Spans:
-
Area:
-
Shade Area:
-
Gutter L:
-
▶
Costing
Margin %
GST %
▶
Bill of Materials
32
Global
Per Layer
Per Zone
Click Generate
▶
Cost Summary
AROSS Cost Summary
T1 (Material Total)
-
Margin (
10
%)
-
Basic
-
GST (
18
%)
-
Total
-
Per sq.m
-
▶
Summary
Click Generate to see layout summary.
▶
Installation Guide
Play the screen opening & closing on the live 3D model. Movement spans the real bay length.
▶ Play Screen Movement
📖 Open Installation Guide (PDF)
Screen
Speed
Closed 100%